HIGHLIGHTS
OF RAILWAY BUDGET, 2004-05
Introduction
- Priority
to development and expansion of railway infrastructure as mentioned in the
Common Minimum Programme.
- Modernization
of Railways, replacement and renewal of assets particularly track renewal,
safety of passengers, cleanliness, improvement in passenger amenities,
control over expenditure and prevention of leakage of revenue to be the
thrust areas.
Review
of Performance in 2003-04
- Loading
target exceeded by 7.39 MT. This is 38.65 MT higher than the previous year's
loading.
- Passenger
traffic registered a growth of about 3%.
- The
Operating Ratio as per approximate actuals
stands at 92.1 % as against 94.1% budgeted.
- Plan
expenditure is expected to be around Rs. 13, 311 cr.
Safety
- Consequential
train accidents came down to 325 in 2003-04 from 473 in 2000-01.
- Over
1280 unmanned level crossings are planned to be manned over a period of
time.
Progress
under Special Railway Safety Fund
- Track
Renewal - 8,938 km of track renewed up to 31-3-04 out of the total target of
16,538 km.
- Replacement
of overaged signaling systems with modern systems completed at 441 stations
and work in progress at 1053 other stations.
- Interlocking
at level crossings with signals completed at 7095 out of 16,549 manned level
crossings.
- Provision
of Train Actuated Warning Device (TAWD) undertaken at 90 selected level
crossings.
- Track
circuiting works in progress at about 5300 locations.
- Rehabilitation/Rebuilding
of 1306 bridges completed, 411 more to be done in 2004-05.
New
Measures for Safety
- Introduction
of Block Proving by Axle Counters, Train Protection and Warning System and
provision of Anti-Collision Device (ACD).
- Safety
on long welded rails through measurement of actual forces.
- Prohibition
on transportation of explosives and inflammable materials in trains to be
enforced.
- Setting
up of Institute of Rescue and Medical Relief at Bangalore with training
modules on Disaster
Management.
Security
- Additional
responsibilities to RPF for escorting passenger trains, etc. w.e.f.
1st July 2004.
- Skills
of existing RPF personnel upgraded.
- Direct
recruitment to RPF reverted from RRBs to Security Department.
Several
Modernisation steps including
- Bridge
improvement and rehabilitation.
- Trials
of corrosion resistant wagons.
- Introduction
of crew friendly cabs.
- Setting
up of International Railway Strategic Management Institute.
- Introduction
of computer based Traffic
Control System.
IT
Measures
- Extension
of Material Management
Information System (MMIS).
- Pilot
project on E-procurement.
- Claim
Offices being computerized.
- Unreserved
Ticketing System being extended.
- Extension
of Passenger Reservation System.
- 300
Goods sheds and sidings to be covered under Rake Management System of
Freight Operations Information System (FOIS).
- Coaching
Operations Information System (COIS) covering passenger coaches and parcel
vans will be implemented.
Catering
- Transparency
in award of catering contracts will be ensured.
- Catering
services at stations and on trains will be improved.
Wholesome milk and milk products sourced from dairy units of
cooperative sector, where possible, will be made available at all catering
outlets.
Cleanliness
- A
nationwide cleanliness drive has been launched - spirit of competition
infused.
- Disposable
"kulhars" will be made available, use of plastic cups to be
discouraged.
- Development
of an environment friendly coach toilet discharge system taken up.
- Upholstery/linen
used on Railways will henceforth be of handloom/khadi
variety.
Book
stalls
- As
per new bookstall policy, allotment at 'B', 'C' & 'D' class stations
open only to unemployed graduates and their associations; 25% reservation to
under privileged section.
- At
'A' class stations, a two packet tender system introduced.
Better
availability of wagons to customers
- Wagon
production to be started at Jamalpur workshop, with marginal augmentation.
- Round
the clock loading and unloading of rakes at terminals to be encouraged.
- Multi-modal
traffic like Roll on Roll off (RoRo)
will be considered.
- Movement
of milk by tankers to be facilitated.
Concessions
- 75%
concession in fares in second and sleeper classes to widows of Defence
personnel killed in action against terrorists/extremists.
- Escort
accompanying a deaf and dumb person also to get 50% concession in fares in
First, Second, Sleeper Classes and in season tickets.
- 75
% concession in fares in II/SL/I/AC Chair Car and AC 3-tier classes for
severe/ moderate haemophilia patients travelling for treatment.
- Full
concession in second class to unemployed youths attending interviews for
selection to Central Government jobs to be implemented.
Projects
- 1222
kms of BG lines added to the system during 2003-04, 1650 Km targeted for
2004-05.
- Jammu
- Udhampur project has been
completed and Udhampur-Srinagar-Baramulla project proceeding as per target.
- Projects
in North Eastern States and Southern States also to be expedited.
- Target
of completion of 1000 kms of gauge conversion in 2004-05.
- 206
kms of doubling has been completed during 2003-04, target for 2004-05 is 381
km
- 72
Surveys for New Lines, Gauge Conversion, Doubling including updating of old
surveys proposed.
- Electrfication
of 504 route kms has been
completed during 2003-04, target for 2004-05
is 375 route-kms.
- 62
throughput enhancement works identified for expeditious completion.
New
Production Unit for Wheel Manufacture
- A
detailed project report to be commissioned for setting up a new Wheel
Manufacturing Unit at Chhapra.
- In-house
utilization of metallic scrap by recycling.
Welfare
measures
- Encouragement
to Railway women employees' welfare and empowerment activities.
- Rs.
5 cr provided for improving the shelters for licensed porters.
- Facility
of one set of privilege pass for the licensed porter (coolie) for self only
from the station of working to any station on Indian Railways and back
extended to the spouse of the porter also.
- Licensed
porters/vendors/hawkers/construction workers associated with the Railways to
be brought under social security net.
- Grant
to be made to Unorganized Workers' Social Security Fund for the benefit of
licensed porters.
Reservation
- A
special drive to be launched to clear backlog of reserved vacancies in ST
& OBC.
Passenger
Amenities
- An
outlay of Rs. 215 cr has been provided for 2004-05
for Passenger Amenity works.
- Deployment
of Lady Ticket Checking Squads.
- 'Village-on-Wheels'
trains comprising ordinary sleeper class coaches to be introduced for common
man.
Passenger
Services
- 15
additional Express trains to be
introduced apart from the 17 Sampark Kranti Express trains announced in the
Interim Budget; 10 Services to
be extended; frequency of 12 popular trains to be increased.
Annual
Plan 2004-05
- Total
Plan outlay is Rs. 14,498 cr including Rs. 2,933 cr through Special Railway
Safety Fund and Rs. 300 cr. separate allotment from General Exchequer for
Udhampur-Srinagar-Baramulla National Project.
- Funds
received from General Exchequer are Rs. 7,020 cr. including 2,075 cr as
contribution to Special Railway Safety Fund and Rs. 401 cr from the Central
Road Fund.
- Internal
generation to provide Rs. 2,870 cr apart from Rs. 858 cr contribution to
SRSF.
- Market
borrowing through IRFC is budgeted at Rs. 3,400 cr and Rs. 50 cr. as
investment through a 'BOT' project in the Viramgam-Mehsana Gauge Conversion
work.
Budget
Estimates 2004-05
- Loading
target fixed at 580 million tonnes, 10 million tonnes higher than the
interim budget target.
- Freight
earnings placed at Rs. 28,745 cr, Rs. 645 cr more than interim budget.
- Passenger
earnings revised downward from Rs. 14,200 cr in the Interim Budget to
Rs. 13,940 cr based on trend.
- Other
Coaching earnings increased from Rs.
990 cr. in the Interim Budget to
Rs. 1,040 cr taking into account the proposed re-classification of
parcel rates.
- The
target for Sundry Other earnings placed at Rs. 1,072 cr.
- The
Gross Traffic Receipt are Rs. 44,902 cr which is Rs. 420 cr higher than the
interim budget.
- Ordinary
Working Expenses budgeted at Rs. 32,960 in the Interim Budget have been
recast and kept at Rs. 32,860 cr.
- The
post interim budget factors like merger of 50% DA with basic pay and
increase in the diesel price will be absorbed by stringent measures for
expenditure control and zero base budgeting.
- Appropriation
to Depreciation Reserve Fund is stepped up from Rs. 1,900 cr in the Interim
Budget to Rs. 2,267 cr.
- Appropriation
to Pension Fund from revenue kept at Rs. 6,290 cr.
- The
total working expenses budgeted at Rs. 41,417 cr and the net traffic receipt
Rs. 4,478 cr as against Rs. 4,225 cr of
interim budget.
- Current
dividend of Rs. 3,305 cr and Rs. 300 cr towards the deferred dividend
liability will be paid.
Freight
Rates
- No
increase in freight rates.
Introduction
of
- Electronic
Payment Gateway for speedy and secure transfer of funds from freight
customers.
- Rebate
of 10% for movement of heavy
machinery.
Passenger
fares
- No
increase in passenger fares.
Parcel
rates
- Around
7.1% increase in Parcel rates under Scale-R, rates under Scale-P to be fixed
at around 53% of the rates under Scale-R as against 43% at present.
- Scale-E
to be merged with Scale -S.
- Scales
of charging parcels to be reduced from 4 to 3.
- The
ratio between highest and the lowest rates will be reduced from 6.2 to 3.0.
- All
types of special Parcel trains including Millennium Parcel trains, to be
charged at Scale -P instead of Scale-S.
- The
adjustment in parcel rates to generate additional revenue of Rs. 50 cr.